The wings are Quick Build -3B model wings purchased from Vans. Although the wings have been fitted to the new spar carry through installed in the Fuselage, a fair amount of work remains to be completed on the wings.
It appears the rear spar attach plates on the right wing were miss drilled, so replacing these two parts should be the only major metal work required.
Given the desire to perform some aerobatics, I have yet to investigate if a flop tube was installed and the appropriate modifications made to one of the fuel tanks.
I also need to determine the best plan for the installation and positioning of the landing lights. Once the lighting method is determined, installation of the fiberglass wing tips will need to be completed.